Home / Products

0 58 mw is taken out in the condenser

  • Exergoeconomic Analysis of 600 MW Thermal Power

    The energy and exergy at input and output of each component is calculated and specified with the help of data taken from the plant. found out to be 0.45, 0 in the condenser where 134 MW is

    Get a quote
  • FAN3852 - Microphone Pre-Amplifier with Digital Output

    FAN3852 3 Table 3. RELIABILITY INFORMATION Symbol Rating Min. Typ. Max. Unit TJ Junction Temperature +150 °C TSTG Storage Temperature Range −65 +125 °C TRFLW Peak Reflow Temperature +260 °C JA Thermal Resistance, JEDEC Standard, Multilayer Test Boards, Still Air 90 °C/W 2. TA = 25°C unless otherwise specified Table 4. RECOMMENDED OPERATING CONDITIONS

    Get a quote
  • (PDF) CONDENSER AND COOLING TOWER

    The condenser is rated to handle 442 t/hr. of exhaust steam at the parameters of 0.1033 ata and 46.1 deg. C Fig 2.11 A typical 210 MW condenser 21 1. Condenser Supports The condenser is supported on 24 springs in the two rows (2 x 12) in order to have flexible connection with the turbine.

    Get a quote
  • webapplnapp.tatapower.com

    CM 8E taken out. 23:20 CW P/P 8A stopped. 00:00 Si- 74 PPB, Chloride – 145 PPB. CBD kept closed as per Chemist (Shinde) 00:45 Condenser north isolated & drained. Condenser north hand over to MMD.RO 2/237831. After cleaning of debris filter 8A gear arm dry trial taken manually as well as electrically, gear motor is rotating but gear arm is not

    Get a quote
  • Condenser Heat Load - Heat Transfer &

    2009-5-20 · The condenser load will be determined by the value of the enthalpy * mass flow of all streams entering minus the enthalpy * mass flow of the subcooled condensate leaving. The LP turbine L-0 blade useed energy end point UEEP may be 10% liquid by weight in a modern steam turbine, and thus this enthalpy is less than sat steram .

    Get a quote
  • Thermal Power Plant Working | INDIAN POWER SECTOR

    2019-10-5 · Diagram of a typical coal-fired thermal power station. Principal. A Boiler or steam generator essentially is a container into which water can be fed and steam can be taken out at desired pressure, temperature and flow. The hot water coming out from the condenser is fed to the tower on the top and allowed to tickle in form of thin sheets

    Get a quote
  • PS6 Solutions - l MAE 105A Introduction to

    Unformatted text preview: l.MAE 105A Introduction to Engineering Thermodynamics Winter 2008 Problem Set 6 In a steam power plant 1 MW is added in the boiler, 0.58 MW is taken out in the condenser, and the pump work is 0.02 MW.

    Get a quote
  • CHAPTER – 14 (Common to Vol. I & II)

    2015-3-16 · CHAPTER – 14 (Common to Vol. I & II) RECENT TRENDS IN HYDRO-ELECTRIC ENGINEERING PRACTICE – ELECTRO MECHANICAL Min. 58 m Generator 4 x 250 MW semi umbrella type with bottom thrust and guide bearing and top guide bearing Unit transformer 300 MVA Generator Vertical axis semi-umbrella 111 MW at 0.9 pf 13.8 kV Unit transformer 306 MW Unit

    Get a quote
  • Condenser Heat Load - Heat Transfer &

    2009-5-20 · The condenser load will be determined by the value of the enthalpy * mass flow of all streams entering minus the enthalpy * mass flow of the subcooled condensate leaving. The LP turbine L-0 blade useed energy end point UEEP may be 10% liquid by weight in a modern steam turbine, and thus this enthalpy is less than sat steram .

    Get a quote
  • Solution CV turbine tank Transient process

    We could with good accuracy have solved using ideal gas and Table A.5 7.17 In a steam power plant 1 MW is added in the boiler, 0.58 MW is taken out in the condenser and the pump work is 0.02 MW. Find the plant thermal efficiency. If everything could be reversed find the coefficient of

    Get a quote
  • Feasibility Study for a Direct, Air-Cooled

    ----- parallel flow condenser stiam of condensation zone mows athiohloao: 8tcam cxdmction q • k • f -at, m g,- gr dead zone = condensate subcooling i.e. a) risk of freezing up at ta«» 0°c b) oxygen pick-up i. risk of corrosion danger increases when cooling air flow is reduced counter flow condenser (dephlegmotor) i.

    Get a quote
  • Steam turbine deaerating condenser perforamace

    I have attached this report where we find out the actual reason steam turbine Deaerating Condenser Performance degradation which was written on June 06, 2012.That time I was in Haripur Power Limited (HPL),A 360 MW CCPP of Pendekar Energy Bangladesh Ltd.

    Get a quote
  • Pro Audio Microphones & Wireless Systems for sale |

    A typical body-pack transmitter has both low and high impedance. Due to a 5V DC connection, it can be used with condenser and dynamic microphones as well as Hi-Z instrument pickups. It is generally powered by two AA batteries, and the RF power output is 30 mW High and 10, switchable, mW

    Get a quote
  • A Performance Evaluation and Optimization of a 135

    Abstract. This study aims to conduct a performance evaluation of a 135 MW Circulating Fluidized Bed (CFB) Coal Based Thermal Power Plant using exergy analysis and use these assessments in order to provide an optimum operation of the said plant. The study includes on determining the effects of ambient condition on the exergy analysis of the plant.

    Get a quote
  • Part_02_4b__

    2010-12-3 · Water spray on top of the cooling tower with water droplets being & extracted out in the air stream which is classified as Drip Loss, Two ) ? & = mw ? + 0.01? h w It

    Get a quote
  • Response Identification in the Extremely Low

    2011-1-10 · This study shows that a small electret condenser microphone connected to a notebook or a personal computer (PC) has a prominent response in the extremely low frequency region in a specific environment. It confines most acoustic waves within a tiny air cell as follows. The air cell is

    Get a quote
  • Efficiency Assessment of Condensing Steam Turbine

    2017-9-27 · tests were fixed to 460 th-1 - 70%, 560 th – 85% and 320 th-1 – 94%. Rate of steam flow to the turbine D0 is 660 th-1, at rated load. Old systems for the management and control in power plant were replaced with the new computing

    Get a quote
  • of S. - South Carolina

    November 2006 Brunswick Unit 2 A. Duration: The unit was taken out ofservice at 18:23 on November 1, and returned to service at 23:56on November 18, a duration of413 hours and 33 minutes. B. Cause: Startup Auxiliary Transformer / Condenser Tube Leaks C. ~Ex lanation: The unit was manually shut down due to the loss ofthe startup auxiliary transformer (SAT3. Maintenance activities were conducted

    Get a quote
  • webapplnapp.tatapower.com

    TWS 8D shear pin broken same replaced and fluid coupling oil topped up. TWS trial taken found OK. At 12:58 hrs CW pump 8D started. Condenser vacuum improved from -0.909 to -0.915 bar. CW pump 8A made standby as IMD required CW pump 8A for checking motor NDE temperature hunting. CW pump 8A stopped vacuum drop from -0.915 to -0.909. 09:00

    Get a quote
  • Steam turbine condenser vacuum problem - CR4

    2013-11-24 · Maximum block gross output is approx. 250 MW where 90 MW of steam turbine is included. Condenser vacuum approx at -925 mbar. both steam ejectors were in service on auto with motive steam pressure at 14.0 bar. Observed condenser outlet pressure improved to 1.2/0.9 bar (press gg is located before the outlet motorized valve). Steam turbine

    Get a quote

Related Products